Helmet Cam video of a long lead out in Stockton, CA where an amtrak train struck a vehicle.  The vehicle was dragged over 700 feet and was on fire.  Companies conduct a search of the train.  The video was posted by bereal2us and description is below.
“Engine 2 and Truck 2 responded an Amtrak train vs. a vehicle which caught fire on 2/6/16. The car was dragged over 700 feet. Crews were faced with rough terrain to stretch 750 feet of hose and water supply issues. Fortunately an additional Engine was requested to assist with water and crews extinguished the fire and searched the train car. No one was injured.”